Location: Kirtland AFB, NM

Upgrade Mezzanine Offices in Building 472 - Remodel included demolition, installing hollow metal steel doorframes, installing wood doors and hardware, tape, texture and painting.  Install carpet, resilient base, and fire extinguisher cabinet.  Stoven Construction also installed automatic sprinkler systems, HVAC system and Electrical system along with a Communication System.