Gila, NM

Rehabilitaiton and maintenance of Forest Road 150.  Installing and removing cattle guards, culverts, reconditioning roadway ditches, and placing borrow.  Surfacing was placed in locations as specified.  Furnished a propelled mobile rock crusher/trimmer of 502 SAE net horse-power with cutter head 138 x 96 inches, capable ofreducing roadside and roadbed generated 3 - 12 inch rock to approximately 1 1/2 inch, and trim bed-rock to shape in-slope and out-slope road bed.  Retrieve roadside rock 3 - 12 inches in size, up to 15 feet each side of the road centerline.