CAFB, NM

Repair interior areas of bo Building as necessary to provide an adequate space for customers and supporting squadron functions as well as to support the growing population due to the new AFSOC mission.

Provide Asbestos/Lead Paint abatement throughout the facility as necessary.  Remove/demo all existing flooring materials in lounge and ballroom areas.  Install laminate wood flooring at lounge area. Install ceramic tile flooring at bar.  Apply painted sponge roller finish to concrete flooring. Install 12 x 12 ceramic tile fireplace/TV wall in lounge area - ceramic tile to extend from floor to ceiling. Install mosaic glass tile at the interior of fireplace surround. Construct 8" raised flooring for booth seating.