Location: Santa fe, NM

Complete build out for the Department of Health, PHD & DHI. 

Including - Demo as required.  We will be installing and re-keying interior doors, reception area and security system. 

On the Exterior we restriped the existing secured parking area.  Adding a new metal landing and loading area as well as a new storefront single door to the landing area.

Finishes included: New flooring, new and existing gravity lock system, replaced existing acousitcal ceiling tiles, updated restrooms and fresh paint.

Mechanical System included a 5-ton heat/cool combination unit with new or re-routed ducting.  The duct was brought up to code and inline dampers were also installed to each supply duct.

Electrical included the demo of existing Cat 5e cabling back to the telecomm room as well as the removal of existing and abandoned electrical systems not in use to the greatest extnet feasible.  Relocte florescent light fixtures.  Insall back boxes, j-boxes, raceway, conduite and thermostate wire for new unit.  Install additional electrical power drops.  Over 200 power/data/voice poles and power/data/voice drops.