Location: Clayton, NM

To Include:

East Roof - remove existing roof and deck to joist.  Install 3/4" plywood/osb to existing joists.  Install 1/2" dens deck and white 60 mil. TPO membrane.  Replace Gutter and downspout on North end.  All walls will be sheather with 7/16" OSB and wrapped with membrane.  Install wood nailer on top of Parapet.  All exterior roof edges will be terminated with 5" face tan TOP drip edge.

Northwest Roof - Sweep off existing roof.  Install 1/8" EPS taper, 1/2" dens deck and white 60 mil. TPO membrane.  Replace gutter and downspout on north end.  All walls will be sheathed with 7/16" OSB and wrapped with membrane.  Install wood nailer on top of parapet.  All exterior roof edges will be terminated with 5" face tan TPO drip edge

Southwest Roof - Sweep off existing roof.  INstall 1/2" dens deck and white 60 mil. TPO membrane.  Flash in new scupper with TPO clad metal.  All walls will be sheathed with 7?16" OSB and wrapped with membrane.  Install wood nailer on top of parapet.  All exterior roof edges will be terminated with 5" face tan TPO drip edge. 

We will remove and replace damaged blown in insulation as needed.  Remove and replace damaged ceiling tiles as needed and replace damaged joists, as needed, in areas to receive new decking.