This scope of work consists of: excavation and construction of a new wet meadow to include modifcations o existing culverts; excavation of a new backwater channel, which connects to existing backwater channel with culvert, installed under existing earth berm; new backwater channel with bank terracing; jetty jackremoval, non-native vegetation removal and revegetation; improvements to the existing Oxbow storm drain outfall to improve flow into the Bosque from the outfall; and other minor work.