CORROSION CONTROL – CRANE System project consists of a complete Bridge Crane System, including supporting structural steel, in Bay #2 at Hangar 199.  This is in support of CV-22 Aircraft Maintenance.  Crane System bridge is a clear span of 96’ in width and a clear height of 22’ throughout the entire Bay #2 area of Hangar 199.  Supporting work to consist of relocation of radiant tube heating systems, pneumatic air systems and addition of new high-bay light fixtures.