Artesia Jr High Renovations

Renovations to Artesia Junior High School consist of multiple Areas of work within the school as well as a new Locker Room addition.

Area A - New locker room addition, 1446 Sf, constructed to the south of the existing gymnasium. CMU and Brick Veneer, with steel roof structure and decking, TPO roof. The addition consist of three (3) new Locker Rooms and three (3) new restrooms, vestibule and janitors room.

Area B - Alter Entry and Existing Boys Locker Room into a Secured Lobby and Front Office.

Area C - Relocate entry to Girls Locker Room.

Area D - Alter the existing Boys Athletic Locker Room and add plumbing fixtures.

Area E - Provide landing and door at the top of the Gym Mezzanine Stairs.

Area F - Provide landing and door at the top of the Gym Mezzanine Stairs.

Area G - Add double doors to North Gym and alter Existing Exterior Sidewalk to include ADA Ramp.

Area H - Replace Existing Sewer Piping between upper and lower levels under the Girls Locker Room, Boys PE, and in the Main Gym crawl space.