21st Century Public Academy - Site Improvements
This Public Charter School located in Albuquerque, NM expanded its facility to include (2) new portable buildings to be used as classrooms. STOVEN CONSTRUCTION INC. was hired to perform the site preparation and set the buildings. The scope of work included; temporary site fencing and SWPPP Control, minor excavation, structural footing placement, setting the buildings, electrical tie-in, ramp/stair installation, and instituting new walk ways for access.